Wachter & Associates was recently retained by Conti Enterprises to develop and update P6 schedules for road improvements to the Hackensack Bridge. This work is being performed by Conti Enterprises under contract NJTA T100.137 which includes Bridge Deck Reconstruction, Miscellaneous Structural Repairs, Roadway Improvements, and Repainting of Structural Steel Structure No. E109.83.
May 2013 M T W T F S S « Apr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 -
Recent Posts
- Wachter & Associates to attend PMISCoP 9th Annual Conference
- W&A Retained for Scheduling of Road Improvements to Hackensack Bridge
- W&A will be exhibiting at the 2011 Construction Superconference
- W&A Retained for Scheduling of Tisch Elevator Tower E & F
- Causation Presentations: Tell Them, then Show Them (Part 2)
Categories
Other Links






